Using the topological information collected during the assess phase, a map of all on-premises applications, virtual machines, and servers is created to determine existing software dependencies and network connections. The map is used as a basis to evaluate an optimal migration strategy for each application and server, and determine an appropriate sequence in which the applications will be migrated. At this stage the future IT environment has been defined along with a gap analysis, and a project plan of the steps needed to be performed.